How to increase the speed of construction of a single-vault metro station and reduce ground settlement?

 

 

PATENT:

2795011

INVENTION:

Single-vault metro station built by the closed method of construction with lateral passenger platforms

INNVENTOR(S):

Zakharov Georgy Rafaelevich, Maslak Vladimir Alexandrovich, Ryabkov Stanislav Valeryevich, Andreev Artur Romanovich

PATENTEE:

Open Joint Stock Company “Research, Design and Exploration Institute “Lenmetrogiprotrans”

PURPOSE:

To reduce the construction time, deformation of the vault of the station and the amount of possible ground settlement above the station, to increase the spatial rigidity of the station lining.

INNOVATION:

The closed method of construction is used in metro construction so as not to affect the urban landscape, landmark buildings, security zones and not to interfere with the movement of transport and people. The invention is a metro station in which the upper vault is made of precast reinforced concrete blocks and rests on monolithic supports, which are equipped with passages to the lateral passenger platforms. Solid contact of the vault with the ground and the elimination of gaps between the blocks of the vault is ensured by the Freyssinet jacks (thin-walled tanks for pumping hardening liquids into them) evenly installed along the vault. At the same time, when the jacks are unclenched, it is possible to turn on the upper vault as quickly as possible and significantly reduce the volume of the cement-sand solution of the primary injection for the lining, which increases the speed of construction.

SCOPE OF
APPLICATION:

Construction of single-vaulted metro stations built by the closed method of construction.

Подробнее в опубликованном патенте.

 

Print

Share:

Last page update:

All updates
next news
Rospatent Presents Reports of 3D and Blockchain Task Forces at the Committee on WIPO Standards
go to news list

Font size

Kourcing:

Яндекс.Метрика